Recent Projects

Herrod Construction T43

Herrod Construction T43

Design/build heating and gas pipe for a 221,000 square foot industrial building using Cambridge direct-fired rooftop heaters.

ePort Logistics Center

ePort Logistics Center

Installation of 80/20 Make Up Air heating system and gas pipe for three spec. buildings and a pumping station. Total project size 1,300,000 square feet.

Dixon Schwabl

Dixon Schwabl

Installation of a Mitsubishi 32-ton VRF heat pump and ventilation system, a 40-ton water chiller replacement, and upgrades to a Carrier VVT zone system for recording studios.

South Brunswick Manor

South Brunswick Manor

Installation of 80/20 Make Up Air heating system and gas pipe for a 478,000 square foot spec. building.

Hugo Neu Realty Management

Hugo Neu Realty Management

Design/build variable refrigerant heating and cooling system for 160,000 sq ft flex office facility.

Jerich Terminal Way

Jerich Terminal Way

Retrofit heating of 80,000 square foot distribution building with Cambridge rooftop heaters.

Heller 285M

Heller 285M

Design/build heating and cooling for 285,000 square foot by 48-foot high distribution building with 3,500 square foot office. Warehouse heating was accomplished with Cambridge heaters.

Fond du Lac Cold Storage 6 & 7

Fond du Lac Cold Storage 6 & 7

Design/build 60-degree cold storage for fine wines in 75,000 square feet and 92,000 square feet tenant spaces.

NYDOT – New Java Facility

NYDOT – New Java Facility

New build office hydronic heating, garage in-slab radiant heat, Car-Mon exhaust, and garage ventilation.

Schrieber Residence

Schrieber Residence

High efficiency boiler system with multiple temperature zoning.