Portfolio

South Brunswick Manor

South Brunswick Manor

Installation of 80/20 Make Up Air heating system and gas pipe for a 478,000 square foot spec. building.

Hugo Neu Realty Management

Hugo Neu Realty Management

Design/build variable refrigerant heating and cooling system for 160,000 sq ft flex office facility.

Perry Central School District

Upgrades to boiler hot water piping system and pump using Victaulic gasket fittings.

OGS Cayuga Correctional Facility

Restroom ventilation improvements in seven high security buildings.

Jerich Terminal Way

Jerich Terminal Way

Retrofit heating of 80,000 square foot distribution building with Cambridge rooftop heaters.

Heller 285M

Heller 285M

Design/build heating and cooling for 285,000 square foot by 48-foot high distribution building with 3,500 square foot office. Warehouse heating was accomplished with Cambridge heaters.

Fond du Lac Cold Storage 6 & 7

Fond du Lac Cold Storage 6 & 7

Design/build 60-degree cold storage for fine wines in 75,000 square feet and 92,000 square feet tenant spaces.

Premier Design/Build Warehouse Projects

Design/build Rupp-Air 80/20 heating system for 488,800 SF new building Design/build Rupp-Air 80/20 heating system for 354,250 SF new building Design/build Rupp-Air 80/20 heating system for 220,200 SF new building Design/build Rupp-Air 80/20 heating system for 718,200 SF new building  

Heller Construction

$285M project to design/build Cambridge heating system for 285,000 square foot new office building with HVAC.

Cayuga Correctional Facility

Fourteen replacement cellblock restroom exhaust systems.