Designer Greetings

Designer Greetings

The project included the installation of a 4,000,000 BTU input, 115,000 CFM air rotation unit with fresh air intake, gas pipe modifications and demolition of the old equipment. This new system was provided to maintain a uniform temperature throughout a thirty-four foot high warehouse where employees worked at floor level.